Model No.︰SLG85
Brand Name︰DT
Country of Origin︰China
Unit Price︰US $ 12000 / pc
Minimum Order︰1 pc
Product Description
Datong company Puffed Snack Foods Making Production Extruder Machine are equipped with the latest process technology, the core of which is the extrusion system with the extruder and the process control system .In the production process, the raw materials undergo the process steps of weighing, fine grinding, mixing, extrusion, drying, vacuum coating, cooling and packaging.
1. Raw materials of Puffed Snack Foods Making Production Extruder Machine :
Adopts corn, rice, wheat, oat, barley, millet, sorghum etc as main ingredients.Other material: salt sugar powder, flavor material, cocoa powder and so on....
2. Snacks food Products shapes of maize puffed food machine :
Variety shapes are available for ball, tube, stick, ring, fruit loop, star, wheel and flower and heart shape by adjusting the mould in the extruder.
3. Puffed Snack Foods Making Production Extruder Machine Capacity:
Model |
Installed power |
Real power |
Output |
DT65 Snack machine |
70kw |
40kw |
100-150kg/h |
DT70 Snack extruder |
90kw |
50kw |
200-240kg/h |
DT75 Food machine |
100kw |
60kw |
300-360kg/h |
DT85 Food extruder |
120kw |
100kw |
400-500kg/h |
4. Puffed Snack Foods Making Production Extruder Machine flow chart:
Grain grinder---Mixing system---Twin screw food Extrusion system----Drying snacks system----Flavoring system--Packing system.
5. Puffed Snack Foods Making Production Extruder Machine Parameter:
Name |
Puffed Snack Foods Making Production Extruder Machine |
Material |
Stainless steel |
Size: |
about 20.0*4.0*4.0m (Free worksho design drawing) |
weight: |
4000-6500kg |
working Power |
380v 50HZ three phase (Customized) |
Packing way |
woodcase or plastic film |
Payment |
T/T or L/C at sight |
Shipment date |
in about 15-25 days |
Snack machine Advantage |
1).Our processing line adopt international advanced technology, the pellets size are very even.
|
6.FAQ
Q: Are you a trade company or a manufacturer?
A: we are a manufacturer, welcome to visit our factory and check the machines.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 20-35 days if the goods are not in stock, we could discuss before contract.
Q: Could you supply all the parameters about the machines?
A: Yes, we will supply all the parameters, price, layout drawing, factory design etc.
Q: What is your terms of payment ?
A: 30% T/T in advance , 70% balance before shippment after inspection.
Q: How about the after-service?
A: We will send 1 engineer to the buyer’s factory for 7-14 days period installation and training to the operators.
Price Terms︰ FOB qingdao port
Payment Terms︰ TT
Packing︰ woodcase
Lead Time︰ 30days